Sector · Greater Manchester
Fire safety compliance for industrial premises
High ceilings, dust, forklifts and shift patterns defeat off-the-shelf fire alarm thinking. Industrial systems need detection chosen for the environment and servicing that fits how the site actually runs.
Your position
Detection that survives the environment it protects
Point detectors at warehouse ceiling height respond slowly and foul quickly. Depending on the space we maintain and specify beam detection across racking aisles, aspirating systems where dust or cold defeat everything else, and heat detection in workshops where grinding and welding make smoke detection unusable. The right technology is the difference between early warning and a system everyone has learned to ignore.
Industrial clients often need P-category cover, property protection, alongside life safety, because the business risk is the building and what is in it. Insurers write requirements into policies; we design and service to meet them and provide the evidence at renewal.
Servicing is planned around shifts and despatch windows. If the only quiet hour is 5am on a Tuesday, that is when we come. MEWP access, permits and RAMS are handled as routine, not as an extra.
Asked by industrial operators
What fire detection works in a high-ceiling warehouse?
Usually optical beam detection across the space, or aspirating systems where dust, cold stores or racking make beams impractical.
Point detectors above about 10.5 metres fall outside BS 5839-1 recommendations for most types. If your warehouse has point heads on a 14-metre ceiling, that is a design problem a service visit cannot fix, and it belongs on the upgrade plan.
Our insurer has demanded a maintained fire alarm. What do they mean?
They want a system serviced to BS 5839-1 by a competent provider, with certificates available at renewal and after any incident.
Policy wording often specifies quarterly or six-monthly servicing and sometimes a P category. We read the policy schedule with you and set the contract to match it exactly, so a claim never fails on a maintenance clause.
Insurer-mandated P1 upgrade for a Trafford Park warehouse
An 85,000 sq ft distribution warehouse in Trafford Park with 13-metre eaves, whose insurer made renewal conditional on a maintained P1 property protection system within 90 days.
Next step: a free compliance check of your unit or site, with a written summary and a fixed contract price.
Get a price